Projects

projects - Healthcare

Complete Construction Services

Call: 01257 271328

  • LinkedIn

Latest healthcare Projects

Gastro 7

Healthcare

Gastroenterology Department


Our client needed extra recovery and office space to enable them to reduce waiting lists. The solution to the problem was four new modular units with access into the existing accomodation.




Read More
20211220 085155

Healthcare

Endoscopy Unit (modular)

The Endoscopy required extra recovery bays. The space was in a inaccessible courtyard and modular build was the only option.

Read More
First Floor Avondale Kitchen

Healthcare

Initial Response Service (IRS)

This project was to work with our cleint to convert an extisting rundown ward, to fit for purpose department for their new IRS Service.

Read More
Histopathology Unit 07012022 161053 1

Healthcare

Histopathology

Conversion of an old records department in to a new state of the art Histopatholgy Department

Read More
Harpurhey

Healthcare

Harpurhey Wellbeing Centre, NHS Mental Health

The existing Harpurhey Wellbeing Centre underwent extensive refurbishment and alterations to ensure community services can be provided for generations to come. The centre users, volunteers, residents and staff contributed to engagement workshops to ensure that the views of the local community were represented.

Read More
Rat

Healthcare

Rapid Assessment Treatment Service NHS

This service was given money to improve patient flow and ensure there were five waiting bays for Ambulance emergencies when they entered the hospital and patients booked in.

Read More
Ed Major Min

Healthcare

Emergency Department Majors NHS

This project was to revamp the Emergency Department (majors) area in a local trust. It was programmed at eleven weeks and the work had to be completed in eight weeks. With careful planning and coordination, we managed to achieve this for the trust.

Read More
Urgent Care

Healthcare

Urgent Care Centre NHS

The Urgent Care Project was at the front of the hospital and was carried out in 6 phases. The whole project was surrounded by live areas and as part of the development strategy, D&G had to manage all the areas effectively. We were praised by staff for how we carried this out and how we managed to carry out the work with minimal disruption.

Read More
Fracture Clinic

Healthcare

New Fracture Clinic NHS

The project was to completely strip back an existing area in the trust and then convert this into a bespoke Fracture Clinic. This included 8 consulting rooms, a plaster room, treatment room, waiting area, reception and an X-Ray room including the installation of a Siemens X-Ray unit.

Read More